Calculate the cubic metres (CBM) of the packed cartons first, then check whether the load actually fits. A total tells you how much volume the cartons occupy, not whether they clear the door, stack safely or stay within weight limits. Use the same packing list to compare a floor-loaded shipment with a palletized one.
Start with a worked carton calculation
Use the outside dimensions of a finished carton, not product or inner-box dimensions. For example, 120 cartons of drill kits measuring 0.50 × 0.40 × 0.30 m occupy 7.20 m³. Another 80 cartons of grinders measuring 0.45 × 0.35 × 0.25 m occupy 3.15 m³. That is 10.35 m³ of cartons, before adding pallets or allowing for gaps and securing materials. Record gross weight, units per carton, allowable orientation and stacking restrictions on each line. If you measure in centimetres, convert to metres before multiplying.
Compare floor loading and pallets on the same order
Floor loading can use more of the available space, but the receiver must be able to unload and sort loose cartons. Pallets simplify forklift handling and can keep destinations separate; their decks, wrap, overhang and unused space change the effective footprint. Use the measured outside length, width and loaded height of each finished pallet, and its gross weight including the pallet. If a carton cannot be rotated or loaded under another item, record that restriction instead of asking the packer to assume a fit.
What should the packer confirm before booking?
Ask the forwarder about the actual equipment, door opening and payload, and check route and road weight limits. Give the packer a row-by-row packing list and ask for a layout that accounts for securing, load distribution and unloading order. If the shipment contains batteries, flag the exact battery configuration and have qualified staff confirm the applicable transport requirements before booking. Agree who must approve changes to carton size, weight or equipment. A quote based on 10.35 m³ is an estimate; a checked layout against the assigned equipment supports the booking.
Use the IMO/ILO/UNECE CTU Code as guidance for packing and securing cargo in a cargo transport unit. It is a non-mandatory code of practice; it does not establish that a particular load fits or replace applicable transport rules.